Works to install alternative disabled access to platform 2 via graded access ramp from high level road access to platform level.
Works included:-
Site clearance.
Import suitable fill to raise to designed levels.
Creation of 2m wide pedestrian access with the required level platforms to comply with the DDA requirements.
Surfacing.
Fencing works and associated DDA compliant hand railing.
Street lighting provision including shrouding to prevent light pollution to adjacent properties.
All works carried out during normal station operating outside peak hours to minimise disruption to the General Public.