Project Highlights:
Design and Build Contract for dualling of slip road at Junction 15A of M1 Motorway:
200 metres of Adoptable Highways
One new canal bridge structure adjoining existing bridge
Improvements / alterations to existing carriageway.
Imported fill to form earthworks embankments.
Large diameter bored piled foundations.
In-situ concrete bridge abutments and deck on GRP formwork
Flood attenuation in precast concrete culverts. Storm sewers, and combined kerb drainage units.
Street Lighting, Signage and Landscaping Works
Requirement to maintain two way traffic at all times.