Rolls-Royce, Filton East Works Bristol

Client: Rolls-Royce Plc
Value: £1.5m
Size: -
Location:
Bristol
Completion:
2009

The dismantling, demolition and regeneration of the site requiring:

  • Extensive Asbestos surveys (to level 3) including safe removal
  • Demolition, processing/reclamation of all structures
  • Extensive earthworks re-profiling including balanced cut/fill solution
  • Site security during the works including protection for adjacent fully operational Rolls Royce plant
  • Safe decommissioning of all existing services including protection for retained facilities
  • Recovery and recycling of materials, the only material disposed directly to landfill was asbestos;
    • 10,000 tonnes of ferrous/non-ferrous metals
    • 1,000 tonnes of wood and 200 tonnes of plasterboard
    • 20,000 tonnes of concrete/hard materials
Client: Rolls-Royce Plc
Size: -
Location: Bristol
Completion: 2009
Value: £1.5m

The dismantling, demolition and regeneration of the site requiring:

  • Extensive Asbestos surveys (to level 3) including safe removal
  • Demolition, processing/reclamation of all structures
  • Extensive earthworks re-profiling including balanced cut/fill solution
  • Site security during the works including protection for adjacent fully operational Rolls Royce plant
  • Safe decommissioning of all existing services including protection for retained facilities
  • Recovery and recycling of materials, the only material disposed directly to landfill was asbestos;
    • 10,000 tonnes of ferrous/non-ferrous metals
    • 1,000 tonnes of wood and 200 tonnes of plasterboard
    • 20,000 tonnes of concrete/hard materials