Falmer Campus, Brighton University

Client: The Community Stadium Ltd
Value: £750,000
Size: Two storey buildings
Location:
Brighton
Completion:
2011

The demolition of a number of university buildings within a live educational site to facilitate the design and build of the iconic, American Express Community Stadium at Brighton. The demolition works involved:

  • Capping of services whilst ensuring continuity of supply to the live campus buildings
  • Level 3 asbestos surveys and the safe removal of asbestos
  • The demolition of numerous two-storey buildings
  • Bulk excavation to reduced levels for stadium construction
  • Crushing, screening and grading of materials for re-use
Client: The Community Stadium Ltd
Size: Two storey buildings
Location: Brighton
Completion: 2011
Value: £750,000

The demolition of a number of university buildings within a live educational site to facilitate the design and build of the iconic, American Express Community Stadium at Brighton. The demolition works involved:

  • Capping of services whilst ensuring continuity of supply to the live campus buildings
  • Level 3 asbestos surveys and the safe removal of asbestos
  • The demolition of numerous two-storey buildings
  • Bulk excavation to reduced levels for stadium construction
  • Crushing, screening and grading of materials for re-use