Allerton Depot

Client: Network Rail
Value: £20.6m
Size: -
Location:
Liverpool
Completion:
2015

We worked collaboratively with Neatwork Rail and the Design Team from GRIP Stage 2 to deliver a new extension and enhanced facilities through GRIP stage 6 – 8 to accommodate 2×4-car units. The works included:

  • Electrifying and extending the existing train shed to accommodate the new, longer electrified trains
  • Modernising the existing maintenance pit for improved access
  • New sanding equipment
  • Electrification of the wheel lathe
  • Commissioned / extended OLE
  • New CET, fuel points, and auto sanding system, maintenance walkways and associated trackworks
Client: Network Rail
Size: -
Location: Liverpool
Completion: 2015
Value: £20.6m

We worked collaboratively with Neatwork Rail and the Design Team from GRIP Stage 2 to deliver a new extension and enhanced facilities through GRIP stage 6 – 8 to accommodate 2×4-car units. The works included:

  • Electrifying and extending the existing train shed to accommodate the new, longer electrified trains
  • Modernising the existing maintenance pit for improved access
  • New sanding equipment
  • Electrification of the wheel lathe
  • Commissioned / extended OLE
  • New CET, fuel points, and auto sanding system, maintenance walkways and associated trackworks