Huyton to Roby Capacity Improvement Scheme

Award Winner
Client: Network Rail
Value: £40m
Size: -
Location:
Huyton and Roby
Completion:
2015

Winner Major Project of the Year – Network Rail Partnership Awards 2015
CEEQUAL Sustainability Performance Rating Excellent – 82.1%

The design and construction of the Huyton – Roby Scheme to provide:

  • Additional two track section between Huyton and Roby stations
  • Pway Remodelling of St Helens Junction
  • New Pway junction at Pilch Lane with 3rd track between these junctions
  • New signalling system linked into Manchester ROC
  • Bridge strengthening / waterproofing works
  • Points Heating
  • OHLE Bases, structures and wiring
  • Works at both Huyton and Roby Stations including:
    • Lift installation
    • New and refurbished platforms
    • Refurbishment of subways
Client: Network Rail
Size: -
Location: Huyton and Roby
Completion: 2015
Value: £40m

Winner Major Project of the Year – Network Rail Partnership Awards 2015
CEEQUAL Sustainability Performance Rating Excellent – 82.1%

The design and construction of the Huyton – Roby Scheme to provide:

  • Additional two track section between Huyton and Roby stations
  • Pway Remodelling of St Helens Junction
  • New Pway junction at Pilch Lane with 3rd track between these junctions
  • New signalling system linked into Manchester ROC
  • Bridge strengthening / waterproofing works
  • Points Heating
  • OHLE Bases, structures and wiring
  • Works at both Huyton and Roby Stations including:
    • Lift installation
    • New and refurbished platforms
    • Refurbishment of subways