MK – Bletchley

Client: Network Rail
Value: £14.5m
Size: -
Location:
Milton Keynes / Bletchley
Completion:
2010

This multi-disciplinary project to widen the West Coast Mainline at MK included:

  • Major earthworks –  450,000 tonnes
  • Major sheet piled retaining walls
  • Installation of 1km of track drainage
  • 1800m of embankment drainage
  • 5 x culvert extensions
  • Capping layer for new track
  • New Platforms at Milton Keynes Station
  • Piling and RC foundations for Signal Gantry Structures
  • Soiling, seeding and protection netting to embankments and cuttings
  • New foundations and deck extension to an existing Overbridge
Client: Network Rail
Size: -
Location: Milton Keynes / Bletchley
Completion: 2010
Value: £14.5m

This multi-disciplinary project to widen the West Coast Mainline at MK included:

  • Major earthworks –  450,000 tonnes
  • Major sheet piled retaining walls
  • Installation of 1km of track drainage
  • 1800m of embankment drainage
  • 5 x culvert extensions
  • Capping layer for new track
  • New Platforms at Milton Keynes Station
  • Piling and RC foundations for Signal Gantry Structures
  • Soiling, seeding and protection netting to embankments and cuttings
  • New foundations and deck extension to an existing Overbridge